PROJECTS

- Dionysios Markoutsas

ARCHTECTURE DESIGN
For every project the factors taken into account during the design are the architectural consistency of the project and the adjustment and its integration to the landscape, natural or constructed, the accurate use of materials and the successful combination between them, the proper function of the building in level of floor plan and layout and the study of the outdoor space surrounding the building, the accurate placing of the building on the land and its bioclimatic design taking into account the climate conditions.

CONSTRUCTION
The proper realisation of the project after an accurate and detailed study is a factor which constitutes principal aim of the office. Theaccurate use and check of materials, the implementation of modern construction technologies and the constant and frequent attendance of the project until the final stage of completion are also essential goals of the office and a necessity as well in order for an architecturally and constructurally intact result to occur. In addition,there is a possibility from the office for the total or partialconstruction of the project in collaboration with specialised crews for even better attendance of the building construction.

RENOVATION
The renovation of buildings, especially residences and hotels, has as a purpose the total upgrade and improvement of the building in terms of morphology − planning and function as well. Usually these interventions can radically change the function and the architectural view of a building, so thatan entirely new building structure emerges.